FG To Shut Third Mainland Bridge From July 24 To 2021 January

FG To Shut Third Mainland Bridge From July 24  To 2021 January

FG To Shut Third Mainland Bridge For Six Months

The Federal Government is set to shut the Third Mainland Bridge for six months starting from Friday, July 24.

This was confirmed by the Federal Controller of Works in Lagos, Olukayode Popoola.

According to him, consultations are ongoing for another phase of repair works to begin on the 11.8km bridge.

Popoola explained that the work will commence on the outward mainland section of the bridge, and the ministry is working with relevant agencies to perfect traffic during the period.

The bridge has gone through a series of repair works and was last shut in August 2018 for a three-day investigative maintenance check.

There have also been reports of some worn-out expansion joints on the structure, raising concerns over the state of the bridge.

This development will force motorists in Lagos who ply the bridge to begin making arrangements for alternative routes.

DOWNLOAD LINK 128 kbps || DOWNLOAD LINK 256 kbps

Adebisi Adedayo

Is Pro Blogger, a Tech and Gadget Freak, Online Content Developer, Digital Marketer, Social Media Manager, Multimedia Personnel, Brand Strategist, PR/Hype Man 📣. You can connect with him on FACEBOOK Whatsapp: +2348167121987 Call: 08094246323

Leave a Reply

Your email address will not be published.